The 70% rule can be a useful first screen for a fix-and-flip deal, but it is not a complete underwriting model. This worksheet shows how to calculate a maximum offer by separating after-repair value, renovation costs, financing, holding costs, selling expenses, acquisition costs, contingency, and target profit—then testing the result against best-case, expected, and downside scenarios.
Overview
The traditional 70% rule for house flipping is commonly written as:
Maximum offer = ARV × 70% − estimated repairs
ARV means after-repair value: the price the property may reasonably command after the planned work is complete. In a simple example, a $300,000 ARV and $45,000 in repairs produce a rule-of-thumb offer limit of $165,000:
$300,000 × 0.70 − $45,000 = $165,000
This shortcut is useful because it is quick. It can help you reject obviously weak opportunities before spending substantial time on inspections, contractor bids, or financing applications. However, the 30% portion is only a rough allowance for several different items: purchase costs, renovation costs, financing, holding costs, selling expenses, and profit. Those items vary by project, lender, location, timeline, and exit strategy.
A detailed fix-and-flip analysis replaces the shortcut with a project-level formula:
Maximum purchase price = ARV − selling costs − renovation costs − contingency − financing costs − holding costs − other project costs − acquisition costs − target profit
If acquisition costs are calculated as a percentage of the purchase price, solve for the purchase price after listing the fixed costs. This approach is more useful when a property has a complicated scope, expensive financing, a long expected hold, or a narrow resale margin.
For a broader review of comparable sales, use the ARV comparable-sales worksheet. The ARV calculator for house flipping can also be used as a companion check.
How to estimate
Step 1: Establish a defensible ARV
Begin with the likely resale value, not the asking price or the most optimistic comparable. Select recently sold homes that are similar in location, size, layout, condition after renovation, and buyer appeal. Adjust your conclusion for meaningful differences such as an extra bathroom, inferior lot, unfinished basement, parking, or unusual floor plan.
ARV should reflect the completed property you are actually budgeting for. If your plan includes a basic kitchen refresh, do not use renovated luxury homes as the primary comparison. If the property needs a permitted addition to match the comparables, include that work and its approval risk in the renovation plan.
Step 2: Build the renovation estimate
Break the scope into line items rather than using a single allowance. Include demolition, disposal, framing, roofing, windows, plumbing, electrical, HVAC, insulation, drywall, flooring, cabinets, countertops, appliances, bathrooms, paint, exterior work, permits, cleaning, and final touch-ups where applicable.
Separate confirmed bids from allowances and unknowns. A room-by-room rehab budget template helps organize these costs. A written contractor scope of work makes bids easier to compare and reduces the chance that a low bid simply omits necessary work.
Step 3: Add contingency
Contingency is a reserve for costs that are plausible but not yet fully known. It is not a substitute for inspecting the property or getting bids. Apply it to the renovation portion—or to a clearly identified risk category—rather than hiding it inside a vague miscellaneous line.
Properties with concealed water damage, outdated systems, structural concerns, incomplete records, or uncertain permitting generally require more caution. Review the house inspection red flags for flippers before treating an early estimate as reliable.
Step 4: Estimate every non-rehab cost
List costs in the period from acquisition through sale:
- Acquisition: purchase closing costs, lender-required fees, title work, recording charges, and initial insurance where applicable.
- Financing: interest, points, draw fees, extension fees, and other loan charges. Confirm whether interest is calculated on the full loan or on drawn funds.
- Holding: property taxes, insurance, utilities, lawn or snow care, security, temporary services, and loan payments during the project.
- Selling: commission or selling fees, seller concessions, transfer charges, staging, photography, marketing, and buyer-requested credits when appropriate.
- Other project costs: permits, architectural or engineering work, legal or accounting support, and post-renovation cleaning.
Do not assume that a short renovation schedule eliminates holding risk. Delays can arise from inspections, material availability, change orders, weather, lender draws, or a slower sale. The house flip permit checklist can help identify approval and closeout steps that affect timing.
Step 5: Set a target profit before making the offer
Target profit is the amount you want remaining after all project costs, including financing and selling expenses. It should not be whatever happens to be left over in an optimistic scenario. Set the target according to the project’s risk, your available capital, the expected timeline, and the consequences of a delayed or lower-priced sale.
Inputs and assumptions
Use this worksheet for each candidate property:
| Input | Worksheet entry |
|---|---|
| Expected ARV | $________ |
| Renovation cost | $________ |
| Renovation contingency | $________ |
| Financing costs | $________ |
| Holding costs | $________ |
| Selling costs | $________ |
| Other project costs | $________ |
| Target profit | $________ |
| Acquisition cost rate | ________% |
| Maximum purchase price | $________ |
First calculate fixed costs:
Fixed costs = ARV − selling costs − renovation − contingency − financing − holding − other costs − target profit
If acquisition costs equal a percentage of the purchase price, divide fixed costs by one plus the acquisition-cost rate:
Maximum purchase price = fixed costs ÷ (1 + acquisition-cost rate)
For example, if acquisition costs are 3% of the purchase price, divide by 1.03. If acquisition costs are a fixed dollar amount, subtract them with the other costs instead.
Keep the 70% rule as a comparison line, not the final answer:
70% rule offer = ARV × 0.70 − renovation cost
Compare this result with the detailed maximum offer. A large difference deserves investigation. It may reflect unusually high selling costs, expensive financing, a long hold, a larger target profit, or an overly conservative renovation estimate.
Worked examples
The following figures are illustrative assumptions, not market quotes. Replace them with property-specific bids, lender terms, comparable sales, and local transaction costs.
Example 1: Expected case
Assume an ARV of $300,000, renovation costs of $45,000, renovation contingency of $7,000, selling costs of 7% of ARV ($21,000), financing costs of $18,000, holding costs of $12,000, other project costs of $3,000, a target profit of $35,000, and acquisition costs equal to 3% of the purchase price.
Fixed-cost calculation:
$300,000 − $45,000 − $7,000 − $21,000 − $18,000 − $12,000 − $3,000 − $35,000 = $159,000
Maximum purchase price:
$159,000 ÷ 1.03 = approximately $154,369
The 70% rule, without a separate contingency or detailed cost schedule, gives:
$300,000 × 0.70 − $45,000 = $165,000
In this example, the detailed underwriting supports a lower offer because it explicitly includes contingency, financing, holding, selling, acquisition, and other costs.
Example 2: Scenario testing
Test the same deal before submitting an offer:
- Best case: ARV $315,000; renovation and contingency $45,000; selling costs $18,900; financing and holding costs $23,000; other costs $2,000; target profit $35,000. With 3% acquisition costs, the maximum purchase price is approximately $191,359.
- Expected case: ARV $300,000; renovation and contingency $52,000; selling costs $21,000; financing and holding costs $30,000; other costs $3,000; target profit $35,000. The maximum purchase price is approximately $154,369.
- Downside case: ARV $280,000; renovation and contingency $67,000; selling costs $22,400; financing and holding costs $42,000; other costs $4,000; target profit $35,000. The maximum purchase price is approximately $106,408.
The spread between these outcomes is the decision point. If the deal only works at the best-case offer, the price may not compensate you for execution risk. You can negotiate a lower purchase price, reduce the scope, improve financing terms, increase the contingency, or reject the property.
When to recalculate
Revisit the worksheet whenever a material input changes—not only when you are ready to close. Recalculate after receiving an inspection report, contractor bids, structural or systems findings, permit feedback, lender terms, or updated comparable sales. Recalculate again if the project schedule extends, the resale strategy changes, or the property needs staging and repairs beyond the original scope. The staging checklist can help you include sale-preparation costs rather than treating them as an afterthought.
Before submitting or renegotiating an offer, save three versions of the analysis: best case, expected case, and downside case. Record the date, assumptions, source of each estimate, and the maximum offer produced. During construction, replace allowances with actual invoices and update the remaining contingency. Before listing, revise ARV and selling costs based on the current property condition and your planned pricing strategy.
A disciplined worksheet does not predict the future. It makes uncertainty visible. Use the 70% rule to screen opportunities quickly, then rely on detailed underwriting to decide what the property is worth to you.